![]() | GEnx-1B SERVICE BULLETIN - 72-0051 R00 | Revised: 01/12/2012 |
SB 72-0051 R00 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Introduce New Stage 3-4 and Stage 6-10 Spools | Issued: 01/12/2012 | |
1. | PLANNING INFORMATION |
A. | Effectivity |
|
This Service Bulletin has been introduced in production to these GEnx-1B54, GEnx-1B58, GEnx-1B64, GEnx-1B67, and GEnx-1B70 engines: |
• |
|
These serial numbers are the best available data. |
B. | Description |
This Service Bulletin releases a new HPC Stage 3-4 Spool P/N 2439M37G01 and a new HPC Stage 6-10 Spool P/N 2439M35G01 onto the GEnx-1B engine. |
C. | Compliance |
Category 7 |
GE recommends that you do this Service Bulletin at customer's convenience. |
NOTE: |
|
The life limits for the new HPC Stage 3-4 Spool P/N 2439M37G01 and the new HPC Stage 6-10 Spool P/N 2439M35G01 have been added to the GEnx-1B Engine Manual, Section 05-11-02 by Temporary Revision 05-0005. Refer to the GEnx-1B Engine Manual for the life limits of these parts. |
D. | Concurrent Requirements |
None. |
E. | Reason |
(1) | Objective: |
To introduce a new HPC Stage 3-4 Spool P/N 2439M37G01 and a new HPC Stage 6-10 Spool P/N 2439M35G01. |
(2) | Condition: |
The current spool designs have features that need improvement in LCF and thermal growth capability to support higher thrust applications. |
The Stage 6-10 spool also has an aft flange with a complicated scallop design which adds complexity to the manufacturing process. |
(3) | Cause: |
Development engine testing of the current design spools showed that additional thermal growth capability of the stage 3-4 spool spacer arm and the stage 6-10 spool stage 8 disk was necessary for higher thrust applications. Also, there were other locations that were limited in LCF capability due to high stress. The current stage 6-10 spool aft flange had not been evaluated for design simplification. |
(4) | Improvement: |
Materials with better thermal growth properties are used in additional areas in both of the spools. For the stage 3-4 spool, the material of the spacer arm between the stage 3 and stage 4 disks is changed from Ti 17 to Ti 6242. For the stage 6-10 spool, the stage 8 disk material is changed from Inco 718 to Rene 88. LCF capability is improved by geometry changes in features of both spools. For the stage 3-4 spool, the aft seal teeth have a larger base radius to reduce the stress at these locations. For the stage 6-10 spool, the stage 7 bore hook interface geometry with the stage 7 bore is changed to reduce stresses at this location. The aft flange scallop was removed to simplify the manufacturing process. |
(5) | Substantiation: |
Substantiation is by analysis and comparative analysis. |
F. | Approval |
This Service Bulletin has been reviewed by the FAA and the repair(s) and modification(s) herein comply with the applicable Federal Aviation Regulations and are FAA APPROVED for installation in the model(s) listed in this Service Bulletin. |
G. | Manpower |
No additional man-hours are required to comply with this Service Bulletin. |
H. | Weight and Balance |
The complete compliance with this Service Bulletin increases weight by 1.1 lb (0.5 kg). |
I. | References (Use the latest version of these documents) |
GEK 112851, GEnx-1B Engine Manual (EM) |
GEK 112864, GEnx-1B Engine Illustrated Parts Catalog (EIPC) |
NOTE: |
|
J. | Publications Affected |
GEK 112851, GEnx-1B Engine Manual (EM) |
GEK 112862, GEnx-1B Cleaning, Inspection, and Repair Manual (CIR) |
GEK 112864, GEnx-1B Engine Illustrated Parts Catalog (EIPC) |
K. | Interchangeability |
Two-way interchangeable for 70K and lower thrust applications. |
L. | Software Accomplishment Summary |
Not applicable. |
2. | MATERIAL INFORMATION |
A. | Material - Price and Availability |
(1) | Parts necessary to do this Service Bulletin: |
|
NOTE: |
|
(2) | Other Spare Parts: |
|
(3) | Consumables: |
None. |
B. | Industry Support Information |
None. |
C. | Configuration Chart |
|
Operation Codes RE=Replace RM=Remains RW=Rework |
Change Codes 2=Two-way interchangeable. |
Support Code B=Old parts will be supplied until all old parts are sold. |
D. | Parts Disposition |
Use serviceable old parts for engines that have not changed. |
E. | Tooling - Price and Availability |
None. |
3. | ACCOMPLISHMENT INSTRUCTIONS |
A. | General |
(1) | Removal and installation instructions for the stage 3-4 spool and the stage 6-10 spool have not changed. Refer to the GEnx-1B EM, 72-31-00, DISASSEMBLY 001 and ASSEMBLY 001. |