![]() | GEnx-1B SERVICE BULLETIN - 72-0093 R00 | Revised: 10/16/2012 |
SB 72-0093 R00 ENGINE - General (72-00-00) - GENX-1BXX/P1G01 Configuration Performance Improvement Package Introduction | Issued: 10/16/2012 | |
1. | PLANNING INFORMATION |
A. | Effectivity |
|
This Service Bulletin has been introduced in production to these GEnx-1B engines: |
• |
|
These serial numbers are the best available data. |
The old configuration GEnx-1BXXG04 is affected by this Service Bulletin. |
B. | Description |
This Service Bulletin releases the configuration GEnx-1BXX/P1G01 which incorporates a redesigned combustion chamber and high pressure turbine for reduced hot section flowpath distress. |
NOTE: |
|
C. | Compliance |
Category 7 |
GE recommends that you do this Service Bulletin at customer's convenience. |
NOTE: |
|
D. | Concurrent Requirements |
To change the engine configuration from GEnx-1BXXG04 to the engine configuration GEnx-1BXX/P1G01, the following three Service Bulletins have to be introduced to the engine: |
• |
|
• |
|
• |
|
NOTE: |
|
E. | Reason |
(1) | Objective: |
To introduce new parts. |
Introduction of the new engine configuration GEnx-1BXX/P1G01 allows an increase in engine thrust ratings up to 75K. |
(2) | Condition: |
Not applicable. |
(3) | Cause: |
Not applicable. |
(4) | Improvement: |
This Service Bulletin certifies the GEnx-1B75/P1G01 configuration and lower thrust configurations to introduce the redesigned product improved combustor, forward inner nozzle support, stage 1 HPT nozzle, and stage 1 HPT blade together for service. All three changes included in this Service Bulletin are required to support a thrust increase up to GEnx-1B75/P1 ratings. |
(5) | Substantiation: |
Substantiation is by analysis and comparative analysis. |
F. | Approval |
This Service Bulletin has been reviewed by the FAA and the repair(s) and modification(s) herein comply with the applicable Federal Aviation Regulations and are FAA APPROVED for installation in the model(s) listed in this Service Bulletin. |
G. | Manpower |
An estimate of the labor cost to accomplish this Service Bulletin may be obtained from any GEnx-1B GEAE authorized Service or Overhaul facility upon request. |
H. | Weight and Balance |
The complete compliance with this Service Bulletin increases weight by 0.10 lb (0.05 kg). |
I. | References (Use the latest version of these documents) |
GEK 112864, GEnx-1B Engine Illustrated Parts Catalog (EIPC) |
GEnx-1B S/B 72-0040, ENGINE - General (72-00-00) - GENX-1BXXG04 Configuration Performance Improvement Package Introduction |
GEnx-1B S/B 72-0067, ENGINE - Combustor Diffuser Nozzle Assembly (72-40-00) - Introduction of New Combustion Chamber |
GEnx-1B S/B 72-0089, ENGINE - High Pressure Turbine Rotor Assembly (72-53-00) - Introduction of HPT Rotor Assembly P/N 2305M57G08 |
GEnx-1B S/B 72-0095, ENGINE - High Pressure Turbine Stage 1 Nozzle Assembly (72-51-00) - Introduction of New HPT Stage 1 Nozzle Assembly |
NOTE: |
|
NOTE: |
|
J. | Publications Affected |
GEK 112864, GEnx-1B Engine Illustrated Parts Catalog (EIPC) |
K. | Interchangeability |
In order to convert a GEnx-1BXXG04 configuration to a GEnx-1BXX/P1G01 configuration, the HPT nozzle, seals and FINS introduced by S/B 72-0095, in addition to the HPT blade introduced by S/B 72-0089, and the combustor introduced by S/B 72-0067 must be concurrently introduced to a GEnx-1BXXG04 as is defined by S/B 72-0040. All hardware is required and configuration chart is set up to show this change. |
For detailed interchangeability go to Service Bulletins listed in the Concurrent Requirements. |
L. | Software Accomplishment Summary |
Not applicable. |
2. | MATERIAL INFORMATION |
A. | Material - Price and Availability |
(1) | Parts necessary to do this Service Bulletin: |
|
NOTE: |
|
(2) | Other Spare Parts: |
|
NOTE: |
|
(3) | Consumables: |
None. |
B. | Industry Support Information |
None. |
C. | Configuration Chart |
|
Operation Codes AD=Add DE=Delete RE=Replace RW=Rework |
Change Code 5=Qualified interchangeability. Refer to paragraph 1.K., Interchangeability. |
Support Codes A=Old parts will no longer
be supplied. B=Old parts will be supplied until all old parts are sold. D=Old parts will be supplied for engines that have not been changed by this Service Bulletin. |
D. | Parts Disposition |
Use serviceable old parts for engines that have not changed. |
E. | Tooling - Price and Availability |
None. |
3. | ACCOMPLISHMENT INSTRUCTIONS |
A. | General |
All accomplishment instructions are published in previously released Service Bulletins. Refer to: |
(1) | GEnx-1B S/B 72-0067, ENGINE - Combustor Diffuser Nozzle Assembly (72-40-00) - Introduction of New Combustion Chamber. |
(2) | GEnx-1B S/B 72-0089, ENGINE - High Pressure Turbine Rotor Assembly (72-53-00) - Introduction of HPT Rotor Assembly P/N 2305M57G08. |
(3) | GEnx-1B S/B 72-0095, ENGINE - High Pressure Turbine Stage 1 Nozzle Assembly (72-51-00) - Introduction of New HPT Stage 1 Nozzle Assembly. |